Skip to main content Skip to secondary navigation

Building System Guidelines

Main content start

Building System Performance Guidelines

The Stanford Building System Performance Criteria Guide (BSPCG) is a set of guideline design documents to be used by faculty, staff, and design professionals during the planning and early design phases of a project. These reference documents illustrate the guidelines related to the variety of systems found on the Stanford campus. The Stanford BSPCG is to be used in conjunction with the Facilities Design Guidelines and applies to construction projects for all Stanford University facilities, including leased properties.

The Stanford BSPCG is not "all inclusive". It does not cover all of the facility systems found in the buildings nor does it cover all design criteria.

Central Vacuum Guidelines

 

Typical Lab

1. Vacuum ( Hg)

>24"

2. Pumping Capacity @ 24" Hg

Per Project Requirement

3. Redundancy
a. Vacuum Pump

a. Yes

4. Emergency Power

No

5. Alarms
a. Vacuum Switch
b. Vacuum Transmitter

a. Yes
b. no

 

Compressed Air Guidelines

ISO8573 Air Quality Standards

Typical General Duty (Class 4)

Typical Lab (Class 2)

1. Oil (Parts per million by weight)

<4

<0.08

2. Dew Points (°F)

<38

<-40

3. Solid Particles (# particles per m3)

<1000

<10

4. Design Air Pressure (psig)

>100

>100

5. Flow Rate (CFM)
a. Computed Total Load
b. Leak Loss and Future Expansion Factor
c. Total Compressor Capacity
d. Load Profile (Peak/Part Loads)

a. Per Project Requirement
b. Per Project Requirement
c. Per Project Requirement
d. Per Project Requirement

a. Per Project Requirement
b. Per Project Requirement
c. Per Project Requirement
d. Per Project Requirement

6. Redundancy
a. Compressor
b. Filtration
c. Drier

a. No
b. No
c. No

a. No
b. No
c. No

7. Emergency Power

No

Yes

8. Alarms
a. Pressure
b. Dew Point
c. Compressor Failure

a. Yes
b. No
c. Yes

a. Yes
b. No
c. Yes

 

DDC Controls Guidelines

 

Typical Project

1. Type of DDC System
     a. LON-Mark open protocol

a. Yes

2. Graphics Type
     a. Web accessible

a. Yes

3. Graphics Display
     a. Floor plan with room number
     b. Floor plan with space T°
     c. Room or T° to change color based on deviation from set
     points.
     d. Click on room to open graphic for room control.
     e. Each room graphic to list all set points, outputs and inputs
     f. Ability to override valve/damper position and set points

a. Yes

b. Yes

c. Yes

d. Yes

e. Yes

f. Yes

4. DDC Capability
     a. Provisions for alarms and trending

     b. Communication bi-directionally with EM&CS using Modbus-
     RTU communications

a. Yes

b. Yes

5. Network connections
     a. Web server to be connected to facilities private LRE network.
     b. All DDC communication wiring to be separate from building
     network wiring. Do not use building Ethernet for LON
     communication.

a. Yes

b. Yes

6. Emergency Power
     a. All DDC components to be connected to standby power if
     available.
     b. Any component that will not automatically restart after power
     loss must have UPS back-up.

a. Yes

b. Yes

 

Deionized Water Guidelines

  Typical Lab
1. Flow rate (gpm) Per Project Requirement
2. Supply Pressure (psi) Per Project Requirement
3. Temperature ( °F) Per Project Requirement
4. Quality
a. Resistivity (M-Ohm) @ 25°C
b. Total Oxidizable Carbon (ppb)
c. Particles ( cts/L)
d. Oxygen (ppb)
e. Bacteria (cfu/vol)
f. Silica (ppb)
g. Metals & other elements (ppt)
a. 4-18
b. Per Project Requirement
c. Per Project Requirement
d. Per Project Requirement
e. Per Project Requirement
f. Per Project Requirement
g. Per Project Requirement
5. Redundancy
a. Storage Tank
b. Pumps
a. Yes
b. Yes
6. Emergency Power No
7. Alarms
a. Pressure
b. Resistivity
c. Particles
d. TOC
e. Silica
f. Tank High & Low Alarm
a. Yes
b. Yes
c. No
d. No
e. No
f. Yes

 

Environmental Guidelines

  Typical Lab Critical Lab
1. Temperature ( °F) 70°F +/- 3°F 70°F +/-1.8°F
2. Relative Humidity (%) None 45%+/-5%
3. Noise Level rating RC 45 RC 35
4. Vibration (micro inches per second) None <125
5. Illuminance Level (fc) 70 to 100 70 to 100
6. Clean room (ISO/Class) None ISO 5/ C100
7. Alarms
a. Temperature
b. Relative Humidity
c. Clean Room
a. Yes
b. None
c. None
a. Yes
b. Yes
c. Yes

 

Process Cooling Water Guidelines

  Typical Lab
1. System Design
     a. Open Tank
     b. Closed Loop
     a. Yes
     b. No
2. Flow rate (gpm) Per Project Requirement
3. Maximum Supply Pressure (psi) Per Project Requirement
4. Differential Pressure (psi) Per Project Requirement
5. Temperature ( °F) 60 - 65
6. Quality
     a. Particles (µm)
     b. pH value
     c. Electrical conductivity (µS/cm)
     d. Other
     a. <50
     b. Per Project Requirement
     c. Per Project Requirement
     d. Per Project Requirement
7. Redundancy
     a. City Water back up                   
     b. Pumps
     a. Yes
     b. Yes
8. Emergency Power No
9. Alarms
     a. Pressure
     b. Temperature
     c. Pump Failure
     a. Yes
     b. Yes
     c. Yes